CPKC train speed
21.3 mph
12 listed facilities in Alberta.
51
Facilities
A large rail directory assembled from multiple sources and improved continuously.
Railhub keeps broad public coverage, labels thinner listings honestly, and tightens records in public over time instead of pretending the whole corpus is fully verified.
State Intelligence
The signals below are limited to railroads with actual facility footprint in this state, plus recent safety and regulatory items tied to the same geography.
CPKC train speed
21.3 mph
12 listed facilities in Alberta.
CPKC terminal dwell
23.8 hrs
Latest system-level dwell reading from the operating metrics feed.
CPKC revenue
$3,800M
Q3 2025 operating ratio 67.9%.
CPKC top commodity
Containers
4,477 weekly carloads in the latest commodity breakdown.
Fort Saskatchewan, Alberta, Canada
No operating summary is published for this record.
Grande Prairie, Alberta, Canada
No operating summary is published for this record.
Oyen, Alberta, Canada
No operating summary is published for this record.